Installation / Architectural Specifications
A “Metal suspension” ceiling system where the runners and channels form a grid system to support the ceiling board. This system provides a structurally sound, uniformly level framework for the hanging of ceiling boards.
Fixing of Runners and Channels
Main runners spacing at 1200mm on center with threaded rod attached to structure above. The spacing of the threaded rod should be 1200mm apart (max) along the main runner. And secondary channels (space 408mm on center) to the main runners.
Fixing of Ceiling Boards
The ceiling board is fixed with self-drilling screws at 600mm on center along each secondary channels. The screw heads should be finished 2mm into the face of ceiling board. A gap of 5mm is left between the boards. It is taped and flushed smooth with jointing compound.
Secondary channels of 3000m section (GC3000); 48mm x 17mm x 0.32mm | Perimeter of 3000mm section(GP-3000); 27mm x 20mm x 15mm x 0.35mm |
Threaded rod of various length | Main runners of 3000mm section (GR-3000); 18mm x 25mm x 0.5mm |
Part Number | Description | Qty/m2(est.)* |
---|---|---|
GR-3000 | Main runners of 3000mm section(GR-3000); 18mm x 25mm x 0.5mm | 0.33 piece |
GC-3000 | Secondary channels of 3000m section(GC3000); 48mm x 17mm x 0.32mm | 0.93 piece |
GS-2 | Channel splice of 0.4mm thick(GS-2); 47mm x 16mm x 0.4mm | 0.93 piece |
Threaded Rod | Threaded Rod - 6mm diameter | 1.00 piece |
Expansion Bolt | Expansion bolt/Drop in anchor | 1.00 piece |
Nuts 6mm | Nuts 6mm | 2.00 piece |
Overall Weight | Maximum Allowable Load |
---|---|
0.83kg/m2 | 7kg/m2 |